Starting with Klaus Sarembe making the final construction welds on the frame.

   
Hans Eickeler did the finetuning by adding some cosmetical welds ...
   

It turned out there was a lot of tension in the frame: only with force the front and the rear half could be bolted together, no good. So I decided (although not much of a choice) to heat the whole frame in an oven to get the tension out.

First of all I scored myself an old 350 engine ...

   

I bolted the frame to the engine and took it to Smit Gloeidienst. For very little money and within a week (thanks guys!) they heated it up with 30°C per hour to about 570°C. When this temperature was reached the oven cooled down with 50°C per hour, to 100°C. This procedure is called 'annealing treatment'.

   

Of course the tension in the steel has to go somewhere. I 'protected' the parts that shouldn't be affected with massive studs.

   

Looks a bit Mad Max, doesn't it?

   
... on the 19th of August 2013 I took the frame and the engine to the RDW at Venlo. The RDW is the one and only official company that does all the licensing of all Dutch vehicles. The procedure to get the bike street legal has two stages: the first is this one, showing the frame and the engine to examine the construction and the origin of the engine. Apart from that I showed them the recording of the first street test, and they liked what they saw.
   
With a special tool they hammered the VIN code (= Vehicle Identification Number) in the steering head.
   
From that moment on the heavy lump of welded steel tubes promoted to an official bike frame.
   

We had to fill in a lot of papers.

RDW stage one was a success. The second stage, at the testing center in Lelystad, will be far more stressful: then the complete bike will be tested on a lot of criteria.

   

The bike's paint job is a two stage job as well: one before and one after Lelystad. Kustombart dared to take up the challenge.

   
Special treatment for the bottom of the tank too. Yes, the same filler ... but covered with a thin layer of gold foil this time. Not because it's pretty but because it will reflect the heat from the engine in a very effective way.
   
Heat, heat, heat, the never ending story. I had the exhaust ceramic coated by S&G Waardenburg. This can cope with high temperature ánd keeps the heat better inside than normal paint.
   

The new ones have the grooves and the seals at a lower position so the pistons can make a longer way.

The third (and hopefully final...) system I designed is as follows:

1: I'll sacrifice one of my NOS bottles for the water-methanol system by filling it with 10 bar of air or nitrogen.
2 and 3: I'll lead the 10 bar to a pressure regulator with an output op 5.4 bar. Why 5.4 bar? 3.4 bar to atomize the water-methanol pushing against max. 2 bar turbo pressure.
4: The 5.4 bar will put pressure on the water-methanol in my swing arm.
5 and 6: Two hoses at the bottom of the swing arm lead the fluid to the solenoids which are controlled by the motor management system.
7. At full throttle the water-methanol will spray into the intake manifold.

It is a nice theory, and I'm looking forward experimenting with it. But right now it's not my main concern: at lower revs, the intake temperature isn't a real issue because the engine has enough power, even without extra cooled intake air.

   
A very delicate and time consuming job.
   
... Niels started installing the wiring loom. Most wires were replaced; it's better now than it ever was before.
   

The end of March Peter and Niels worked on the wiring together.

   
Things are going well.
   

April 13th 2014: the first engine start since one and a half year, since October 5th 2012. After a minor problem with the wiring the engine ran instantly, and sounded like it had never been shut down.

   

"Is that all you've done?"

Well no. Hell no! But the more the bike reaches its final looks, the less I can use any pictures without revealing it. To give an impression: new cylinder head covers, installed new master brake and master clutch cylinders, added a overflow tank for the cooling system, replaced the clutch release bearing and the clutch pilot bushing, made new heat shields for the exhaust, improved the side stand, finetuned the gear drive, improved the rear braking system and the crankcase breather.

What's next? Next month a final (I hope) Dyno test, a final (I hope) street test, clearing lots of small (I hope) problems. And then: Lelystad, here we come!

To be continued, of course.